Mar. 5th, 2002

rmd: (Default)
well, having finished all the tile work in the the upstairs bathroom, now i finally get to take apart the downstairs bathroom and make it water-tight around the tub. the base of the current wall-covering is all swollen and rotting and clearly not long for this world. so i pulled part of it down and it looks like the wallboard behind is actually okay. which is very good.

but now i have to pull off all the faucet hardware stuff so i can pull the faux-tile-covered-masonite off of that wall, too.

i am not a plumber. no, no i am not. gosh! a new learning curve.

also, holy shit it's march and this means i have to get even more uptight about studying for the CISSP test. eek!
rmd: (Default)
i just need to point out that my brother's surgically chiselled body looks fabulous.

Profile

rmd: (Default)
rmd

June 2025

S M T W T F S
1234567
89 1011121314
15161718192021
22232425262728
2930     

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jul. 18th, 2025 01:54 pm
Powered by Dreamwidth Studios