the cobbler's children go shoeless.
i finally got the electrical work related to my porch finished. which means the electrical inspector can do a final electrical inspection on it, which means the building inspector can sign off on the porch.
just under the wire, as i think the permit expires in late march.
NOT THAT I WAS PROCRASTINATING. oh, wait, that's exactly what i was doing.
i have to say, it felt nice to finally check that off of my list of crap i've been delaying.
i finally got the electrical work related to my porch finished. which means the electrical inspector can do a final electrical inspection on it, which means the building inspector can sign off on the porch.
just under the wire, as i think the permit expires in late march.
NOT THAT I WAS PROCRASTINATING. oh, wait, that's exactly what i was doing.
i have to say, it felt nice to finally check that off of my list of crap i've been delaying.
no subject
Date: 2009-03-01 05:45 am (UTC)no subject
Date: 2009-03-01 07:16 pm (UTC)Congrats! I've yet to actually get house numbers up on our "new" porch.
no subject
Date: 2009-03-01 07:21 pm (UTC)